Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

« Previous Version 5 Next »

This page provides the user with an overview on Managing Daily Rates.

These are the topics on this page:

Introduction

The HCP basic daily fee is set by the Department of Health and Aged Care and is paid by everyone, with the daily fee determined by the HCP Level.

The maintenance of HCP daily rates are managed through the Daily Rates record grid within the Funding Source profile. Maintenance events will include establishing new records when there is a Daily Rate change or editing an existing Daily Rate, if it has been entered incorrectly.

The daily rate registered to the record must adhere to the rates specific with the HCP Level, refer to additional information.

image-20240314-001934.png


Additional Information

https://www.myagedcare.gov.au/home-care-package-costs-and-feeshttps://www.health.gov.au/topics/aged-care


Registering a New Daily Rate

To register a new HCP package level daily rate observe the following steps:

Access the Funding Source list either via the Administration menu or through the HCP Package Management dashboard. Refer to the HCP Funding Source Information topic.

  • No labels